Was thinking about podium buildings and how they mix construction types (typically Type I and Type III or V). I suppose there is some well thought through economics to the podium model, essentially getting the extra floors without having to go fully Type I or II, essentially the most floors for the least cost.
My question is however, have you experienced mixing of other construction types in the same manner? Such as 3 stories of Type VB on top of a Type IIIB first floor? I've got an R-2 building with a dedicated A-2 ground floor. I can only get 3 stories out of Type VB sprinklered, so it would make sense (I think) to make my first floor a Type IIIB "podium". Has anyone seen this strategy done before?
Can you think of any potential downsides? thanks,
Was thinking about podium buildings and how they mix construction types (typically Type I and Type III or V). I suppose there is some well thought through economics to the podium model, essentially getting the extra floors without having to go fully Type I or II, essentially the most floors for the least cost.
My question is however, have you experienced mixing of other construction types in the same manner? Such as 3 stories of Type VB on top of a Type IIIB first floor? I've got an R-2 building with a dedicated A-2 ground floor. I can only get 3 stories out of Type VB sprinklered, so it would make sense (I think) to make my first floor a Type IIIB "podium". Has anyone seen this strategy done before?
Can you think of any potential downsides? thanks,