• Welcome to the new and improved Building Code Forum. We appreciate you being here and hope that you are getting the information that you need concerning all codes of the building trades. This is a free forum to the public due to the generosity of the Sawhorses, Corporate Supporters and Supporters who have upgraded their accounts. If you would like to have improved access to the forum please upgrade to Sawhorse by first logging in then clicking here: Upgrades

Replacement Window Flashing with Vinyl Siding

jar546

Forum Coordinator
Joined
Oct 16, 2009
Messages
10,975
Location
Somewhere Too Hot & Humid
The house had a major renovation that included new replacement windows and vinyl siding with wood trim that was not capped with aluminum.

In this case the water runoff goes right behind the siding. Can you think of any IRC code section that would cover this?

For those that don't inspect this kind of work, and that is going to be your only comment, don't bother. Can we please discuss the issue at hand? Thanks.
 

Attachments

  • IMG_1059.JPG
    IMG_1059.JPG
    218.4 KB · Views: 19
Good one Jar, the classic failure to flash and use of dissimilar materials.
Replacement companies do this all the time.
 
R703.1.1 Water resistance. The exterior wall envelope
shall be designed and constructed in a manner that prevents
the accumulation of water within the wall assembly by providing
a water-resistant barrier behind the exterior cladding
as required by Section R703.2 and a means of draining to
the exterior water
that penetrates the exterior cladding.
 
I never really understood why anybody thought letting water get to a water-resistant barrier behind the exterior cladding was the way to go. In my opinion, the water shouldn't get that far. I've installed miles of siding of all types and took measures to repel water.
 
# ~ #
" I never really understood why anybody thought letting water get to a water-resistant barrier behind the exterior cladding was the way to go. "
IMO, ...they did not know the proper way to install it, ...they were not allowed to
by their bosses, or they simply did not care enough to do it ocrrectly.

A lot of contractors make part of their profit by "cutting corners".......Nothing new there !
And since time is money, ....El Jeffe' wants things done quickly, ...VERY QUICKLY !.....That
usually means, "just slap something in & hope that no one catches it"........If someone
DOES catch it, they can always claim ignorance, or hope that another Inspector will let
it go.


# ~ #
 
Top