This is the result when a commercial company moves a 3 phase machine to a new location without hiring an electrician, does not pull a permit or gets an inspection. What violations do you see here?
What you don't see is:
*20' of FMC already damaged laying on the floor with no connector on the machine end.
*30' of SO cable from a junction box, across the bottom of a garage door to the disconnect
*A junction box not properly grounded without a cover
BTW, this is a 3 phase 240v Delta with a 208 high leg on the C phase (white)