• Welcome to the new and improved Building Code Forum. We appreciate you being here and hope that you are getting the information that you need concerning all codes of the building trades. This is a free forum to the public due to the generosity of the Sawhorses, Corporate Supporters and Supporters who have upgraded their accounts. If you would like to have improved access to the forum please upgrade to Sawhorse by first logging in then clicking here: Upgrades

Cash Bond Requirements

To guarantee landscaping survives the first 12 months. To guarantee that any temporary work in the highway right of way is completed.
 
We require it on all new construction for main buildings on a lot. The deposit is refunded once they have complied with their conditions of the building permit (ie: mandatory inspections completed, debris has been cleaned up, etc.).

Accessory buildings are typically exempt.
 
I remember building a branch bank in charlottesville about 15 yrs ago. Tough town to get a permit, took almost a year for that. They required a cash bond for something. Paid and forgot. A year later they contacted us ... do you want your money back? Ok, fill out this form. And they gave it back with interest.
 
Rarely. If there's City money involved, or if the developer is adding streets, sidewalks, utilities, etc. that will at some point be transferred to the City then a bond and development agreement is required, but other than that, never.

We do require a deposit for work in the right of way (tearing up streets and/or sidewalks for water/sewer line replacement, mostly) that we return upon completion as long as Public Works is happy with the work, but that's not really a bond.

In case it makes a difference in what you're looking for with the answers - our building dept. is combined with planning, zoning, and code enforcement (and some other things nobody else wants to do....).
 
All contractors working within the public ROW are required to be bonded
The building department will allowing bonding of non-life safety items to complete the project that can't be completed due to weather or other unforeseen circumstances. This allows the owner to move in and operate without having a project 100% complete. Most weather related items are paving and landscaping. We did one for siding on a large commercial project but the contractor let us know that his siding was on back order months before it was scheduled to be installed
 
Our Building Inspection Division does not do ANY bonds. If there is one required for infrastructure or landscaping it goes through our Planning Division, or Engineering Development Review Division.
 