The exterior was stucco which was removed. OSB has been installed. New window openings for 12 windows are framed. This is the first requested inspection visit which was rough electrical. The plan is to install retro-fit windows and they contend that the window installation instructions show it done like this. I haven't seen the instructions but I have reservations.