• Welcome to the new and improved Building Code Forum. We appreciate you being here and hope that you are getting the information that you need concerning all codes of the building trades. This is a free forum to the public due to the generosity of the Sawhorses, Corporate Supporters and Supporters who have upgraded their accounts. If you would like to have improved access to the forum please upgrade to Sawhorse by first logging in then clicking here: Upgrades

gypsum baord

  1. indyarchyguy

    3 Hour Firewall Cracking

    A project that was constructed approximately 18 months ago in Indiana (2012 IBC with 2014 amendments). A warehouse has 3-hour firewalls that sit on top of a concrete curb of approximately 12-inch height from the top of the floor. The walls have started cracking in three different locations (see...
  2. S

    membrane / sheathing

    In Ontario building code, "membrane" and "sheathing" are used thousands of times. When we are saying membrane in every day life, it means a thin sheet, like paper or wrapping sheet, while in OBC, a sheet of "gypsum board" can be called "gypsum board membrane", see OBC SB-2 2.3.4.(1). My...
  3. M

    Gyp Board Extending 6" above T-Bar Clg - Code?

    Hope you are all doing well out there, we are still stuck at work as boss feels the health situation is overblown. I ran into a situation where a contractor/client want to know specifically why and if required by code the Gypsum Board on a non-bearing interior stud wall must extend 6" above the...
Top