The contractor excavated the pool and placed the steel. The sewer for the dwelling ran through the back yard to a trunk line in an alley and the contractor interrupted 15' of it with a swimming pool. The deep end was full.
I didn't post a picture because you haven't had dinner yet.
I didn't post a picture because you haven't had dinner yet.
Last edited by a moderator: