Mech
REGISTERED
IBC 2009
Automotive Dealership with use groups B, S-1, S-2.
Existing second level (not sure if it’s a mezzanine or second floor yet) consisting of 2,650 sf. Occupant load is over 50. Per 1104.4, exception 1, an accessible route to the existing 2,650 sf level is not required since the area is less than 3,000 sf.
Another second level, 700 sf and unattached to the existing second level, is proposed for parts storage. Per 1104.4, exception 4, where a two-story building or facility has one story with an occupant load of 5 or fewer persons that does not contain public use space, that story shall not be required to be connected by an accessible route to the story above or below. The occupant load of this parts storage level will be less than 5.
Am I exempt from accessibility for both areas? I’m thinking that even though the parts area is exempt due to exception 4, the existing second level would now be required to have an accessible route since the aggregate area of stories and mezzanines exceed 3,000 sf.
Thoughts?
Thanks in advance.
Automotive Dealership with use groups B, S-1, S-2.
Existing second level (not sure if it’s a mezzanine or second floor yet) consisting of 2,650 sf. Occupant load is over 50. Per 1104.4, exception 1, an accessible route to the existing 2,650 sf level is not required since the area is less than 3,000 sf.
Another second level, 700 sf and unattached to the existing second level, is proposed for parts storage. Per 1104.4, exception 4, where a two-story building or facility has one story with an occupant load of 5 or fewer persons that does not contain public use space, that story shall not be required to be connected by an accessible route to the story above or below. The occupant load of this parts storage level will be less than 5.
Am I exempt from accessibility for both areas? I’m thinking that even though the parts area is exempt due to exception 4, the existing second level would now be required to have an accessible route since the aggregate area of stories and mezzanines exceed 3,000 sf.
Thoughts?
Thanks in advance.