Looking for clarification on using VB construction with two full stories above grade along with a half story (habitable attic). Would a full basement that is predominately below grade make this a 3-1/2 story house if classified as R5? Thanks.
Edit: Also wondering why R5 occupancy does not show up in table 504.4?
Edit: Also wondering why R5 occupancy does not show up in table 504.4?
Last edited: