• Welcome to the new and improved Building Code Forum. We appreciate you being here and hope that you are getting the information that you need concerning all codes of the building trades. This is a free forum to the public due to the generosity of the Sawhorses, Corporate Supporters and Supporters who have upgraded their accounts. If you would like to have improved access to the forum please upgrade to Sawhorse by first logging in then clicking here: Upgrades

Flower Shack Conversion, CMC 1204.1 & 2016 CEnC 140.4(n)

jandrulaitis

Registered User
Joined
Mar 14, 2017
Messages
2
Location
Santa Barbara
Converting an existing flower shack to serve beer for a beer garden. Mechanical code requires heating but energy code requires shut off for operable windows. The shack will only be used when the front service window is open so the heating system will never be operable when the space is occupied. Logic says there's no point in installing a heating system, the code says otherwise and is in conflict with the energy code. Anyone have experience with this requirement and similar uses such as small flower shops, parking lot attendant sheds and guard shacks?
 
Top