LSTOPS39
REGISTERED
I am working on an existing pole barn (post-frame) structure remodel where a portion of the space is classified as A-3 assembly for the lounge/ light kitchen area, and A-5 assembly for the remaining covered pavilion open air area. I am being asked to provide fire separation information between the two areas. Does anyone know what is required? 1 hour, (2) layers of 5/8" type x? I typically work in residential, so this is new territory! Thank you.