MtnArch
SAWHORSE
All -There's an issue going on with a project I am peripherally involved in having to do with a ramp handrail/guardrail supplied by a modular building manufacturer. I've been asked to research the issue to try and resolve it.The attached JPG shows the typical installation by the supplier; the upper rail is a square tube (1.25" per face), the pickets below are 5/8"thk and have clear spacing of 3-7/8". The inspector has brought up that there are multiple problems with this (including required extensions) but one of them that is being contested is that the handrail/guardrail installation does not comply with CBC 1012.4 or with CBC 1135B.5.5.1 (for continuity and obstructions).I can see both sides of this - the supplier claiming that they install these up and down the state year-in and year-out without any problems, and the inspector doing his best to ensure compliance with the code as he reads it. Both appear to be reasonable in wanting to resolve the issue but this one seems to be a sticking point.What say you? Does this comply or is this another one of those "It can't be wrong because this is the way we've ALWAYS done it"?
View attachment 1772
View attachment 1772
/monthly_2013_04/572953e854a5d_ModularRampHandrail.jpg.61fcbd33f8d998000602f08e385dcc90.jpg
View attachment 1772
View attachment 1772
/monthly_2013_04/572953e854a5d_ModularRampHandrail.jpg.61fcbd33f8d998000602f08e385dcc90.jpg