• Welcome to the new and improved Building Code Forum. We appreciate you being here and hope that you are getting the information that you need concerning all codes of the building trades. This is a free forum to the public due to the generosity of the Sawhorses, Corporate Supporters and Supporters who have upgraded their accounts. If you would like to have improved access to the forum please upgrade to Sawhorse by first logging in then clicking here: Upgrades

Plan review

Sifu

SAWHORSE
Joined
Sep 3, 2011
Messages
2,803
I thought I knew this but my situation has caused me to re-visit this issue.

From the 2006 IRC:

106.1 allows the BO to waive plan submittal and review

106.3 examination of documents and in 106.3.1, requires stamp approval of plans.

So which is it?
 
OH yeah, 106.4 prohibits deviation from those plans.
 
If you waive the submittal of plans there are no plans to put the approval stamp on, so you don't have to comply with 106.3.
 
I guess I'm being thick again. 106.1, a distinct section requires submittal of plans and the requiremnt that they be prepared by a DP then waives that requirement by exemption. A completely different section 106.3 requires eaxmination of construction documents. No exceptions. Why two different codes? The commentary for each code basically says the same thing as the code. 106.3 then has supportive sub-sections, appearing to give it more specific requirements. I have always operated under the assumption that a BO could waive residential submittal but 106.3 throws that in doubt.
 
Do you require plans for a window replacement or water heater replacement. How about a concrete drive way or installation of a fence or re-roof a SFR?

Some projects do not need a "plan" a simple describtion of the work would be sufficient

"R & R existing windows with U.33 glazing meeting current energy code"
 
Agree with mtlogcabin. We do not require plans with like for like repairs either (think fire damage or non structural interior remodel or finishing an attic or storm damage). A good structural inspector can look at these jobs without plans. Sometimes all you need is a floor plan to distinguish new work from existing. The AHJ can waive the necessity for plans at the discretion of the person reviewing the plans or the B. O. Don't think I would try it with a new house though!
 
Well put MT and DO....if you waive the plans......every other requirement for them goes out the... U.33, 5.7sf, tempered becuse it is less than 24" from a door...window! :)
 
Going to continue this over in code talk for a better explanation.
 
steveray said:
Well put MT and DO....if you waive the plans......every other requirement for them goes out the... U.33, 5.7sf, tempered becuse it is less than 24" from a door...window! :)
Not sure I follow this - how does waiving plans effect any other code compliance? Just because I didn't see it in writing first, doesn't mean I'm not going to inspect to code...
 
Darren Emery said:
Not sure I follow this - how does waiving plans effect any other code compliance? Just because I didn't see it in writing first, doesn't mean I'm not going to inspect to code...
He meant other requirements related to the drawings, not the requirements of the rest of the code.
 
Sorry Darren...after reading that I realize it was a little confusing....I meant PLAN requirements go out the mindow...not code....

Darren Emery said:
Not sure I follow this - how does waiving plans effect any other code compliance? Just because I didn't see it in writing first, doesn't mean I'm not going to inspect to code...
 