    711.2.3 Supporting Construction for Horizontal Assembly, R-2 above B

    2018 IBC: 3-story Type VB NFPA 13 sprinklered construction, level 1 ground floor is Group B with levels 2 and 3 Group R-2 above. 711.2.3 Exception 2 - IF pursue mixed use nonseparated occupancies, will this exception 2 allow the horizontal assembly between B and R-2 not be rated? Exception...