• Welcome to The Building Code Forum

    Your premier resource for building code knowledge.

    This forum remains free to the public thanks to the generous support of our Sawhorse Members and Corporate Sponsors. Their contributions help keep this community thriving and accessible.

    Want enhanced access to expert discussions and exclusive features? Learn more about the benefits here.

    Ready to upgrade? Log in and upgrade now.

may be installed provided

  1. S

    Flow control roof drains allowed to install with declaration where the maximum drain down time exceeds 24 h

    This is from Ontario building code Division B part 7: ----------------------------------------------------------------------------------------------------------------------------------- 7.4.10.4. Hydraulic Loads from Roofs or Paved Surfaces ... (2) Flow control roof drains may be installed...
Back
Top