power

  1. JimmyTreeX

    When to pull meters after a roof/plumbing leak

    We have had a lot of rain here in upstate NY which has resulted in A LOT of roof leak calls. At some of the calls, the Fire Department calls for National Grid (our utility/gas provider) to come inspect the property and determine if the meters should be pulled due to the water leaking into light...
  2. A

    Tie 6+ 14-2 together for ceiling lighting

    Ok so the 14 guage wires are stacking up in my attic jbox, I am in solution trouble. I will have 9 total 14-2 to tie together. Wire nut 9 wires together is very ghetto and questionable I agree. Its a larger jbox the 4x4x2.5" So whats the best to go about this? Jump/pigtail a wire to another jbox...
  3. indyarchyguy

    4 Story I-1...Generator?

    Recently a LFO asked me if a 4-story I-1 would be required to have an emergency generator. I looked and can't seem to find anything requiring the generator. Any suggestions would be most helpful. Thank you.
Back