100eyeballs
Bronze Member
What to do when a building is not required to have a Fire Command Center?
1008.1.9.7 Delayed egress locks. Approved, listed, delayed egress locks shall be permitted to be installed on doors ... provided that the doors unlock in accordance with Items 1 through 6 below...
3. The door locks shall have the capability of being unlocked by a signal from the fire command center.
1008.1.9.7 Delayed egress locks. Approved, listed, delayed egress locks shall be permitted to be installed on doors ... provided that the doors unlock in accordance with Items 1 through 6 below...
3. The door locks shall have the capability of being unlocked by a signal from the fire command center.