120/240 3 phase metering

jar546

CBO
Joined
Oct 16, 2009
Messages
12,973
Location
Not where I really want to be
What is wrong with this picture? 2008 NEC applies along with POCO rules.

7f4fcc99.jpg
 
The red should be orange.

110.15

Also most 3 phase 240/120 delta meters require the high leg to be installed on the far right terminal in the meter.

Chris
 