I have a project that went back in to plan check for a plan change related to the HVAC ductwork because there were less HVAC units on the roof than the developers plans indicated there would be.. This is a "B" occupancy stand alone pad building for a financial services company. The building is new. First generation build out and is fully sprinklered. The interior corridors are therefore non-rated.
The GC was down there and the plan reviewer said................although these are non rated corridors you still need to comply with 1018.5 " Air movement in corridors". These corridors are conditioned and there are supply and returns located in the corridors to achieve this. All returns are ducted. we are not using the space above the ceiling as a plenum in any way. I am trying to understand this "NEW" comment? It doesn't sound correct to me?
The GC was down there and the plan reviewer said................although these are non rated corridors you still need to comply with 1018.5 " Air movement in corridors". These corridors are conditioned and there are supply and returns located in the corridors to achieve this. All returns are ducted. we are not using the space above the ceiling as a plenum in any way. I am trying to understand this "NEW" comment? It doesn't sound correct to me?