• Welcome to the new and improved Building Code Forum. We appreciate you being here and hope that you are getting the information that you need concerning all codes of the building trades. This is a free forum to the public due to the generosity of the Sawhorses, Corporate Supporters and Supporters who have upgraded their accounts. If you would like to have improved access to the forum please upgrade to Sawhorse by first logging in then clicking here: Upgrades

2015 IRC errata removing photovoltaic pathways

Brian 2

Registered User
Joined
May 18, 2017
Messages
17
Location
Denver
Page 3 of this errata deletes sections R324.7 through R324.7.2.5 for Photovoltaic pathways, access, etc. These sections appeared in the 1st 2015 IRC printing and they are in the 2018 IRC. Can anyone shed some light why the errata deletes these sections? Were they relocated to another location or was the intent to remove these requirements?

https://www.iccsafe.org/wp-content/uploads/errata_central/2015-IRC-Errata-Chapter-3.pdf

Thanks!
 
Top