jumper
Bronze Member
I was asked these questions once in another forum and never really resolved any clear answers in my mind. This a hypothetical question, not an actual install.
(1). If a 3 conductor cable with 2 hots and a neutral, such as SE, is installed in a PVC conduit - can a separate EGC be pulled in and be compliant in connecting up a sub panel?
(2). What about pulling the SE cable in EMT or RMC and using the conduit as the EGC?
(1). If a 3 conductor cable with 2 hots and a neutral, such as SE, is installed in a PVC conduit - can a separate EGC be pulled in and be compliant in connecting up a sub panel?
(2). What about pulling the SE cable in EMT or RMC and using the conduit as the EGC?