• Welcome to The Building Code Forum

    Your premier resource for building code knowledge.

    This forum remains free to the public thanks to the generous support of our Sawhorse Members and Corporate Sponsors. Their contributions help keep this community thriving and accessible.

    Want enhanced access to expert discussions and exclusive features? Learn more about the benefits here.

    Ready to upgrade? Log in and upgrade now.

300.6?

Francis Vineyard

REGISTERED
Joined
Jan 1, 2010
Messages
3,105
Location
Charlottesville, VA
2005 NEC Both 2B constructions location is in the mechanical room.

Two separate calls, different electricians from different localities working different jobs here in the city; can the switch gear sit on the concrete floor and the other can the trough sit on the concrete floor?

The other jurisdictions said no! Am I missing something?

Thanks for all responses
 
Last edited by a moderator:
If the gear and trough are enamel coated and NOT embedded in concrete or direct contact with the earth, not in a wet location and not outside, I don't understand why they can't be.

Maybe the problem is with 300.6(A) that uses that one simple word: "approved"
 
Not sure if there was another article that would address this area, but I realize now that these guys were being smart and calling ahead to be sure that they didn't have to do something they hadn't heard of before too.
 
Back
Top