2005 NEC Both 2B constructions location is in the mechanical room.
Two separate calls, different electricians from different localities working different jobs here in the city; can the switch gear sit on the concrete floor and the other can the trough sit on the concrete floor?
The other jurisdictions said no! Am I missing something?
Thanks for all responses
Two separate calls, different electricians from different localities working different jobs here in the city; can the switch gear sit on the concrete floor and the other can the trough sit on the concrete floor?
The other jurisdictions said no! Am I missing something?
Thanks for all responses