Guest
The pipes sticking out of the wall are for an under-slab heating system. There is going to be a section of warehouse that is to become a freezer and the heating system is to prevent the concrete slab from cracking. In the process of boring they cut a conduit with 4160 volt conductors. The second picture shows a 5'6'' deep trench next to and under a RR spur for a new conduit run. The trench will run the entire length of the building.
The spur hasn't been used in several years so they didn't bother to contact the RR. I gave them the option of an engineered back-fill or remove the tracks with the written permission from the RR and the building owner. In either case they must have permission from the RR to be in the RR right of way.
The only permit so far is an electrical permit for conduit and conductors.
The spur hasn't been used in several years so they didn't bother to contact the RR. I gave them the option of an engineered back-fill or remove the tracks with the written permission from the RR and the building owner. In either case they must have permission from the RR to be in the RR right of way.
The only permit so far is an electrical permit for conduit and conductors.