glzath
REGISTERED
IECC 2015
Adding on a 2700 SF addition to an existing 50,000 SF manufacturing facility. Approximately 2/3rds of the addition will have new, exterior walls with the remaining 1/3rd using a shared wall with the existing plant. Conditioning of the two spaces will be similar. How would that shared wall be classified in ComCheck (Other:Exterior?) and what "R"/"U" value would I use for that 1/3rd portion?
Thanks
Adding on a 2700 SF addition to an existing 50,000 SF manufacturing facility. Approximately 2/3rds of the addition will have new, exterior walls with the remaining 1/3rd using a shared wall with the existing plant. Conditioning of the two spaces will be similar. How would that shared wall be classified in ComCheck (Other:Exterior?) and what "R"/"U" value would I use for that 1/3rd portion?
Thanks