The investigation of this tragedy continues, the State Contractors' License Board is sanctioning several fo the contractors involved, but the District Attorney is not prosecuting them criminally, there are now Senate Hearings and the architects' board is going to be disciplining the architects. I decided to put this information here in the architects' forum but it covers several areas, ADA requirements, the use of cheaper materials, and inspection requirements as to moisture content and manufactured wood sealer in light of the experts' investigations.
They are going to hold the architects responsible for specifying "a cheaper laminated wood beam and called for it to be notched two inches before it extended out from the building's main structure.", I think we determined that the end joists were LVLs and not PSLs?
Apparently all "Manufactured wood products also require wood sealer to be applied to areas that have been cut open to further prevent water intrusion", I've never used LVLs, PSLs, or OSB, but I have used lots of Glue Lams, I've never sealed the cuts in Glue Lams, do you guys who have inspected these other "manufactured wood products" require they seal the cut surfaces?
This could get interesting, even though the District Attorney is not criminally prosecuting the contractors will she prosecute the architects criminally? The article just refers to administrative sanctions. If so will the architects put the blame on the city for requiring cheap construction to comply with their "affordable housing" requirements and their money-losing mixed use requirements? As I've said before, liability should run clear back to BlackRock, the hedge fund that set the unrealistically low budget. Will the city be held liable for failure of the building inspector to check the moisture content of the wood at framing inspection?
¹ http://www.eastbaytimes.com/news/ci_29811157/berkeley:-scrutiny-turns-to-balcony-design-during-state-senate-hearing
And we start to get into it:\ said:SACRAMENTO -- In the first indication that the design, and not just construction mistakes, may have contributed to the Berkeley balcony collapse last summer, the board that oversees licensed architects revealed Monday that it has joined the investigation into the tragedy that killed six people.To date, prosecutors, victims' attorneys and state contractor investigators have said the cause of the collapse was water infiltration during the construction of the Library Gardens balcony, which led to catastrophic dry rot. Investigators and attorneys have alleged that five construction firms failed to meet industry standards, using cheaper materials that would exacerbate water infiltration and covering up wet wood with waterproofing materials that sealed in the moisture.
However, Doug McCauley, executive director of the California Architects Board, told the Senate Committee on Business, Professions and Economic Development on Monday afternoon that the design of the balcony is also receiving attention.
"As far as I know, our investigation is still open," McCauley told state Sen. Loni Hancock, D-Berkeley, when asked about the balcony design. "I can say this much, we've cooperated extensively with the (Alameda County District Attorney's) efforts."¹
Consequences of LBJ's stupid Civil Rights Act to make everybody equal, "people with disabilities" must have "architectural barriers" removed (even in existing structures) so there can be no step down to decks, I see this coming to single family too as obnoxious Disability Activists are demanding "visitability" codes for single family homes, Austin Texas is the first city nationally to start imposing them.\ said:Bill Leys, a San Luis Obispo-based deck expert, said the architect specified a cheaper laminated wood beam and called for it to be notched two inches before it extended out from the building's main structure. That additional space would allow room for a concrete topping slab to be added, complying with disability-access requirements to the deck.Deck joists must have a 2 percent slope, which allows water to move away from the building as required by code, Leys said. Manufactured wood products also require wood sealer to be applied to areas that have been cut open to further prevent water intrusion, he said.
Leys said none of that was called for in the architectural designs.
"As soon as that beam got wet where the notch is, it was the beginning of the end," Leys said.
They are going to hold the architects responsible for specifying "a cheaper laminated wood beam and called for it to be notched two inches before it extended out from the building's main structure.", I think we determined that the end joists were LVLs and not PSLs?
Apparently all "Manufactured wood products also require wood sealer to be applied to areas that have been cut open to further prevent water intrusion", I've never used LVLs, PSLs, or OSB, but I have used lots of Glue Lams, I've never sealed the cuts in Glue Lams, do you guys who have inspected these other "manufactured wood products" require they seal the cut surfaces?
I've never seen an inspector carry a moisture meter, I've never even had an inspector ask me if I had checked the moisture content before closing in a building, a building in the framing stages could be delayed months waiting for the lumber to dry down unless the builder hired one fo those fire/flood restoration companies to seal the houses up and install those huge drying fans to dry them out.\ said:Also at the hearing, Berkeley building officials spoke about the accident. Patrick Emmons, supervising building inspector, said that only now are his inspectors required to use moisture sensors to determine whether wood registers below 19 percent moisture content, the maximum allowed by state building codes before wood is enclosed. Heavy rain during the Library Gardens construction allowed water to soak the wood before the balcony interior was covered, investigators found.
This could get interesting, even though the District Attorney is not criminally prosecuting the contractors will she prosecute the architects criminally? The article just refers to administrative sanctions. If so will the architects put the blame on the city for requiring cheap construction to comply with their "affordable housing" requirements and their money-losing mixed use requirements? As I've said before, liability should run clear back to BlackRock, the hedge fund that set the unrealistically low budget. Will the city be held liable for failure of the building inspector to check the moisture content of the wood at framing inspection?