jar546
Forum Coordinator
Have a car was submission where the proposed permit holder will be acting as the GC and does not have contracts in place yet for some of the trades. His employees will be taking care of most of the building portions (never works out good).
Anyway, this is a 4 bay car was with one of them being an automatic bay and a mechanical room. All total about 2300 square feet. He is trying to tell me that the whole thing is going to cost about $100,000 in order to keep permit costs down so I am opting to get a realistic number by using the BVD. The stamped drawings call it a VB construction and a B occupancy. I would use that column but then feel as though I should deduct the 20% for "shell only". Thoughts?
Anyway, this is a 4 bay car was with one of them being an automatic bay and a mechanical room. All total about 2300 square feet. He is trying to tell me that the whole thing is going to cost about $100,000 in order to keep permit costs down so I am opting to get a realistic number by using the BVD. The stamped drawings call it a VB construction and a B occupancy. I would use that column but then feel as though I should deduct the 20% for "shell only". Thoughts?