jar546
CBO
When is it acceptable to accept structural engineering calculations from an architect who is not a PE?
Where is the line drawn (may be State specific) as to where the job of the architect legally ends and the PE begins?
Where is the line drawn (may be State specific) as to where the job of the architect legally ends and the PE begins?