For those in California or those who do projects in California, I have a question regarding CALGreen Section 5.410.2.
The provision states that "New buildings 10,000 square feet and over" require building commissioning. They do not use the term conditioned floor area defined in CALGreen Chapter 2, nor do they use the building area defined in CBC Chapter 2. They do not even use "enclosed area." How has the 10,000 square foot threshold been interpreted?
The reason I ask is that I have a building with a conditioned floor area of less than 4,000 sq. ft., but when you add exterior covered areas (extension of the roof) and unconditioned storage areas, the area exceeds 10,000 sq. ft. Am I required to provide building commissioning or not? The project is a golf course clubhouse, so I do not think Exception 2 would apply.
The provision states that "New buildings 10,000 square feet and over" require building commissioning. They do not use the term conditioned floor area defined in CALGreen Chapter 2, nor do they use the building area defined in CBC Chapter 2. They do not even use "enclosed area." How has the 10,000 square foot threshold been interpreted?
The reason I ask is that I have a building with a conditioned floor area of less than 4,000 sq. ft., but when you add exterior covered areas (extension of the roof) and unconditioned storage areas, the area exceeds 10,000 sq. ft. Am I required to provide building commissioning or not? The project is a golf course clubhouse, so I do not think Exception 2 would apply.