Yikes
SAWHORSE
My understanding of the California energy codes effective 1/1/2020 is that new buildings must have solar PV (whereas before they only need space for the future solar PV).
For you building officials and plan checkers: do you accept deferred submittal per CBC 107.3.4.1 for the solar design? Do you require calcs for the proposed solar fraction, or can this be deferred as well?
For you building officials and plan checkers: do you accept deferred submittal per CBC 107.3.4.1 for the solar design? Do you require calcs for the proposed solar fraction, or can this be deferred as well?