Ryan Schultz
SAWHORSE
I probably know the answer to this already, but just wanted to verify.
In the following floor assembly, is it possible to have RC channel attach directly to the joists, and then have the (2) layers of gyp bd. outside that?
In the following floor assembly, is it possible to have RC channel attach directly to the joists, and then have the (2) layers of gyp bd. outside that?
- RC
- Gyp Bd.
- Gyp Bd.
- Gyp Bd.
- RC
- Gyp Bd.