Bryan Holland
Silver Member
Is it the intent of the section below in the 2009 IPC to require 18 inches of clearance from an adjoining structure / obstruction or 18 inches above / in front of the cleanout.
This is in reference to the buildng sewer / building drain cleanout located outside of a building.
This is in reference to the buildng sewer / building drain cleanout located outside of a building.
708.8 Clearances. Cleanouts on 6-inch (153 mm) and smaller pipes shall be provided with a clearance of not less than 18 inches (457 mm) for rodding.