• Welcome to the new and improved Building Code Forum. We appreciate you being here and hope that you are getting the information that you need concerning all codes of the building trades. This is a free forum to the public due to the generosity of the Sawhorses, Corporate Supporters and Supporters who have upgraded their accounts. If you would like to have improved access to the forum please upgrade to Sawhorse by first logging in then clicking here: Upgrades

Commercial Fire Barrier Inspections (Renovations)

jar546

Forum Coordinator
Joined
Oct 16, 2009
Messages
11,046
Location
Somewhere Too Hot & Humid
In a commercial building, no matter the type, whether an office space or mid-rise/high-rise condo, when do you:

1) do the fire penetration inspections. (during framing?)
2) do the fire barrier inspection (after drywall screw?)

Also, when does your fire department get involved vs the building inspector for items in chapter 7 and other related such as chapter 9?
 
Here FD does a little more looking.

Normally penetration done right before it gets covered up, mainly because trades keep making holes.

Fire barrier almost the same answer.

Normally, though almost anytime I am in the building, I am looking. I like to get ahead of things.

Sometimes we require third party, with spot check follow up, because the third party is a joke most of the time.
 
1 & 2 every inspection that is done for the wall: framing, mechanical, electrical, plumbing, insulation, drywall and final.

The volunteer's of the local fire company don't know anything about codes and have no certifications or insurance to do an construction inspection.
 