jar546
Forum Coordinator
In a commercial building, no matter the type, whether an office space or mid-rise/high-rise condo, when do you:
1) do the fire penetration inspections. (during framing?)
2) do the fire barrier inspection (after drywall screw?)
Also, when does your fire department get involved vs the building inspector for items in chapter 7 and other related such as chapter 9?
1) do the fire penetration inspections. (during framing?)
2) do the fire barrier inspection (after drywall screw?)
Also, when does your fire department get involved vs the building inspector for items in chapter 7 and other related such as chapter 9?