north star
MODERATOR
- Joined
- Oct 19, 2009
- Messages
- 4,596
> > > &
I have a project where a bldg. owner wants to construct a small
vestibule at the front entrance to his bldg...….The plan is to
install a small store-front type assembly with a new Double Door
Assembly installed...…..The applicable Code is the `18 IECC.
The area is a Zone 3, Warm & Moist application.
I want to meet the glazing safety requirements and the Solar
Heat Gain Coefficient ( SHGC ) and the Winter U Factor
requirements for this project.
I am having difficulty in determining the min. requirements in
the IECC.
Any assistance will be GREATLY appreciated !
& < < <
I have a project where a bldg. owner wants to construct a small
vestibule at the front entrance to his bldg...….The plan is to
install a small store-front type assembly with a new Double Door
Assembly installed...…..The applicable Code is the `18 IECC.
The area is a Zone 3, Warm & Moist application.
I want to meet the glazing safety requirements and the Solar
Heat Gain Coefficient ( SHGC ) and the Winter U Factor
requirements for this project.
I am having difficulty in determining the min. requirements in
the IECC.
Any assistance will be GREATLY appreciated !
& < < <