jar546
CBO
I just had this question asked of me on email.
I have an existing complex that is being renovated the service and gear is 45 years old. Coming out of the disconnect they have 4 under ground conduits feeding a MDP, All of the phases are in separate conduits A Phase in one conduit, B phase in another and so on, no Grounding conductor either. This I feel violates Arts. 366.20 and 250. I mentioned to the EC and Engineer they have to comply with the Art for parallel services and Art. 366.20. The Engineer is telling me they don't have to be replaced. In short of writing about this what is your opinion. Art 366.20 was adopted to the 2017 NEC.