I'd like to get a feel from other AHJ's on when you require a F/A install in an existing building undergoing T.I. work.
What is your trigger for installation? At what point would you consider the T.I. work to be "new" construction, therefore requiring the F/A installation as in a new building.
Does anybody use a formula for F/A installation on existing buildings that is similar to sprinklers for existing building's ( more than 50% of the square footage, or more than 50% of the value, etc.)
Thanks.