Per the IBC, construction type IB requires 2 hour rating for floor construction and associated secondary structural members.
If I have a 3 1/2" NW concrete slab on 1 1/2" metal deck (which has a FR of 1 hr) can I use mineral fiber insulation underside of deck between beams to raise the rating to 2hr? (The room below needs to be open to deck and thus no gyp ceiling)
Not sure if the 2 hr rating for IB construction has to be achieved independently by the slab on deck or it can be coupled with Insulation to acheive the rating ?