Green-rev
REGISTERED
Hi,
I am currently working on a new construction commercial project that has (5) separate units inside (1) building. The owner is looking to rent out the units without knowledge of the future tenants or their end use. The overall size of the building is 10560SF and is being built as non-sprinklered, VB. Since, we don't know the end use of the units, but knowing that the most obvious uses will be B, M, S-1, and/or F-1, I am looking at using the most restrictive of each to ensure that we meet code. With allowable increase for frontage, we are permitted up to 13513SF using the most restrictive allowable building area, F-1. We are able to meet all requirements for a non-sprinlered, non-separated, mix-use building according to the 2018 IBC. The issue we are having is that AHJ wants us to use 2-hr fire-rated walls as the separation wall between the units. I tries to explain that the building meets code without having the fire-rated walls, but he is sticking to his guns. Am I missing something in the codes that states you need fire- separation between individual units in the same building? Does the AHJ have the right to make us go above and beyond the code to appease their minds? I appreciate any insight.
I am currently working on a new construction commercial project that has (5) separate units inside (1) building. The owner is looking to rent out the units without knowledge of the future tenants or their end use. The overall size of the building is 10560SF and is being built as non-sprinklered, VB. Since, we don't know the end use of the units, but knowing that the most obvious uses will be B, M, S-1, and/or F-1, I am looking at using the most restrictive of each to ensure that we meet code. With allowable increase for frontage, we are permitted up to 13513SF using the most restrictive allowable building area, F-1. We are able to meet all requirements for a non-sprinlered, non-separated, mix-use building according to the 2018 IBC. The issue we are having is that AHJ wants us to use 2-hr fire-rated walls as the separation wall between the units. I tries to explain that the building meets code without having the fire-rated walls, but he is sticking to his guns. Am I missing something in the codes that states you need fire- separation between individual units in the same building? Does the AHJ have the right to make us go above and beyond the code to appease their minds? I appreciate any insight.