jar546
CBO
This is the underside of a corridor for an office building. It was a large, open bank building and the 2nd floor was added a few years ago. Your are looking at 2x8s 16" oc and a 15'6" span. This is the back corridor which leads to an stairwell.
As you can see they used 2x4 on the flat and placed solid blocking in this area to compensate for the over-span. The width of the corridor is approximately 52" in this area.
Has anyone ever seen a setup like this?
My guess is that this still does not meet the loading requirement for a corridor in an office building.
As you can see they used 2x4 on the flat and placed solid blocking in this area to compensate for the over-span. The width of the corridor is approximately 52" in this area.
Has anyone ever seen a setup like this?
My guess is that this still does not meet the loading requirement for a corridor in an office building.
