FM William Burns
Moderator
Q1: What are some of the typical approved and or listed design schemes being used to provide a means for meeting the forward flow testing requirements of 13 and 25 with system demand and hose stream?
Q2: Will a test of the fire pump at 100 % rated capacity achieve sufficient verification that the BF or RPZ meets the forward flow testing requirement in 13?
Q3: If there is not a fire pump on the system does one revert to the answer to Q1?
Thanks,
Q2: Will a test of the fire pump at 100 % rated capacity achieve sufficient verification that the BF or RPZ meets the forward flow testing requirement in 13?
Q3: If there is not a fire pump on the system does one revert to the answer to Q1?
Thanks,