I'm working on a renovation project (2015 Michigan Building Code) of a tenant suite (Mercantile) in a strip mall. Construction type is IIB, single story. The suite is around 13,500 SF. The City said it will need to be suppressed because the maximum SF is 12,500 per table 506.2. The building is surrounded by parking lot and open space, so I was hoping to use the frontage increase per 506.3.2 to increase the allowable area.
The City's response is that the frontage increase is "only for an increase in the square footage of a building as the same construction type. These calculation do not change the fact that the building still needs to be fire suppressed per MBC 2015 table 506.2, maximum square footage of 12,500 square feet." I'm not really sure what is meant by the first sentence in this response. I wasn't exactly sure if the frontage increase calculations can be used for a portion of a building or are meant only to apply to the entire building.
I was hoping to get some feedback on whether or not my initial thoughts about the frontage increase are valid before I push back on the City's response or ask for clarification.
Thanks!
The City's response is that the frontage increase is "only for an increase in the square footage of a building as the same construction type. These calculation do not change the fact that the building still needs to be fire suppressed per MBC 2015 table 506.2, maximum square footage of 12,500 square feet." I'm not really sure what is meant by the first sentence in this response. I wasn't exactly sure if the frontage increase calculations can be used for a portion of a building or are meant only to apply to the entire building.
I was hoping to get some feedback on whether or not my initial thoughts about the frontage increase are valid before I push back on the City's response or ask for clarification.
Thanks!