Morphdesigns
Sawhorse
I am designing a new 11,900 sqft pre-engineered metal building. I have 3,000 sqft of office space, in which I have a full-height, insulated wall, between the warehouse and this office space. Office space has a drop-in suspended ceiling. The HVAC contractor wants to put his HVAC units above this ceiling, and hang them from the metal building purlins. Metal building guy already has ok'd that load from his purlins.
On my last project, I had a reviewer tell me that based on IMC306.1, "this void space above the office area has not been approved for any usage and the furnaces may not be located in this area". Up to that point, I had always hung units above the ceiling line.
Any thoughts?
Wisconsin, IBC 2012
On my last project, I had a reviewer tell me that based on IMC306.1, "this void space above the office area has not been approved for any usage and the furnaces may not be located in this area". Up to that point, I had always hung units above the ceiling line.
Any thoughts?
Wisconsin, IBC 2012