ameliasolis
REGISTERED
Need some advice on how to handle a situation, so mistakes are not repeated....
Timeline...
Put up two 15K bu bins in October, concrete had been poured about two weeks before bins were set up, we began filling as soon as the 1st bin was finished. There was about 3 weeks from the time the concrete was poured until the 1st bin was filled completely, (mounded up in the center). A couple of weeks ago we had some pretty hard freezes around here (Southern Middle Tennessee). Toward the end of the cold spell is when I noticed the cracks forming.
The location of the bins required that we dig down for the left bin and put down about 1 to 4 feet of fill dirt under the right bin. At first I thought it was a packing problem and we did not pack it well enough and the ground was settling. The right bin is the one that has the most severe cracking problem, but now the left bin is cracking too.
My question is there one thing that jumps out that caused the concrete to break, or is it a chain of events that let up to it, or a bad batch of concrete? It appears that the footer each bin is sitting on is still intact, but the pad is starting to crack severely around the edge of each footer.
Timeline...
Put up two 15K bu bins in October, concrete had been poured about two weeks before bins were set up, we began filling as soon as the 1st bin was finished. There was about 3 weeks from the time the concrete was poured until the 1st bin was filled completely, (mounded up in the center). A couple of weeks ago we had some pretty hard freezes around here (Southern Middle Tennessee). Toward the end of the cold spell is when I noticed the cracks forming.
The location of the bins required that we dig down for the left bin and put down about 1 to 4 feet of fill dirt under the right bin. At first I thought it was a packing problem and we did not pack it well enough and the ground was settling. The right bin is the one that has the most severe cracking problem, but now the left bin is cracking too.
My question is there one thing that jumps out that caused the concrete to break, or is it a chain of events that let up to it, or a bad batch of concrete? It appears that the footer each bin is sitting on is still intact, but the pad is starting to crack severely around the edge of each footer.