I am working on a first responder training facility built with shipping containers.
It will be 2 wide x 3 long and will be 2 containers high.
I believe this is a Group U facility. Please correct me if I'm wrong.
1) Roofing
1.1) What are the roofing requirements for this type of facility?
1.2) Is a pitch required?
1.3) Is a formal roofing system required or are the metal container roofs sufficient?
1.4) What codes should I refer to?
1.5) Are there any levels of watertightness required?
2) Walls
2.1) Are there any levels of watertightness required?
2.2) What codes should I refer to?
It will be 2 wide x 3 long and will be 2 containers high.
I believe this is a Group U facility. Please correct me if I'm wrong.
1) Roofing
1.1) What are the roofing requirements for this type of facility?
1.2) Is a pitch required?
1.3) Is a formal roofing system required or are the metal container roofs sufficient?
1.4) What codes should I refer to?
1.5) Are there any levels of watertightness required?
2) Walls
2.1) Are there any levels of watertightness required?
2.2) What codes should I refer to?