jar546
Forum Coordinator
First floor is an A2 in the front with R2 in the back.
Second floor is all R2 directly above the A2.
So how do you meet a 2 hour fire separation for the new A2 going in the existing unsprinklered building?
Paint!
http://www.firefree.com/docs/Manu%20Spec%20FF88.pdf
Second floor is all R2 directly above the A2.
So how do you meet a 2 hour fire separation for the new A2 going in the existing unsprinklered building?
Paint!
http://www.firefree.com/docs/Manu%20Spec%20FF88.pdf