I am trying to figure out the distance I need to extend the insulation under slab for a slab on grade application. The attached image from Upcodes is saying that Table C402.1.3 indicates that the table should tell me the distance (circled in red). When looking at the table, I don't see anything. All I see is the vertical requirement (Example: " Slab-on-grade < unheated slabs < Climate Zone 6 < R-10 for 24" below"). Am I missing something here?