I am working on a house project that has two full stories above grade over a basement. There is a third story that is under the roof and is constructed using attic trusses. I am looking at the bracing requirements for the first floor and I am trying to determine in Table R602.10.1.2(1) (90 mph) which diagram this first floor belongs with: a. the center diagram of the second grouping or b. the right most diagram of the third grouping. I attempted to upload a pdf to go along with my question but cannot make one under 50 KB.
Also, if for Method PFH as shown in Figure R602.10.4.1.1 there is a limit for the number of stories that can be over the portal frame? In Figure R602.10.3.3 it mentions different widths depending on whether it is a one or two story structure, but no mention in R602.10.4.1.1.
Thanks,
Donald
Also, if for Method PFH as shown in Figure R602.10.4.1.1 there is a limit for the number of stories that can be over the portal frame? In Figure R602.10.3.3 it mentions different widths depending on whether it is a one or two story structure, but no mention in R602.10.4.1.1.
Thanks,
Donald