The correction had to do with a cabinet being used as a J-box that was mounted over a hole in the wall. There were cable connectors coming through the back. When they asked me what should be done I gave them several options, one of which was to recess a J-box. So thery did recess a J-box and cut out the back of this cabinet.


Another correction had to do with conduit entries through intact KOs. Well they did install bonding bushings.



Another correction had to do with conduit entries through intact KOs. Well they did install bonding bushings.

Last edited by a moderator: