JoeDude
REGISTERED
Hello,
First time posting here. Hope this is the right place.
I recently had water damage in my kitchen. The contractor will need to replace 6 of the Joist and the entire subfloor. The insurance company is telling me that the contractor has to intentionally install the new joist and subfloor so that it is not level. This is to match how the floor was before the damage. Basically copy the cutout from the joist getting replaced. I do not understand this. I am trying to find out if a building code stipulates how a Joist and subfloor need to be installed. I would hope a joist and or subfloor needs to be installed with a +/- tolerance. Any information would be very much appreciated.
First time posting here. Hope this is the right place.
I recently had water damage in my kitchen. The contractor will need to replace 6 of the Joist and the entire subfloor. The insurance company is telling me that the contractor has to intentionally install the new joist and subfloor so that it is not level. This is to match how the floor was before the damage. Basically copy the cutout from the joist getting replaced. I do not understand this. I am trying to find out if a building code stipulates how a Joist and subfloor need to be installed. I would hope a joist and or subfloor needs to be installed with a +/- tolerance. Any information would be very much appreciated.