A2 SINGLE STORY BUILDING W/O SPRINKLER SYSTEM, about 5,000 sf renovation work for restaurant:
As fire marshal requests new sprinkler system in the building unless the work area is under 50% of whole space.
1. Expand kitchen, new equipment, new plumbing, mechanic, electric work - level 2
2. Expand BAR area, same location, add new equipment, plumbing & electrical work - level 1 or level 2 ?
3. Remove existing ceiling @ dining area, adding new lighting fixtures, electric wiring work - level 1 or level 2?
4. Adding wall and door - whole floor space where adding wall to be considered as work area or just area of wall itself ?
Thanks!
As fire marshal requests new sprinkler system in the building unless the work area is under 50% of whole space.
1. Expand kitchen, new equipment, new plumbing, mechanic, electric work - level 2
2. Expand BAR area, same location, add new equipment, plumbing & electrical work - level 1 or level 2 ?
3. Remove existing ceiling @ dining area, adding new lighting fixtures, electric wiring work - level 1 or level 2?
4. Adding wall and door - whole floor space where adding wall to be considered as work area or just area of wall itself ?
Thanks!